Project References

     

Year

Project Description/Work Scope

Client

Address

Status

13-Jan

Welding Warehouse, Build Wastewater System

Wisynco

White Marl Industrial Complex, Spanish Town

Main Contractor

13-Jul

Setting out and construction of Building, Structural Steel Work, Carpentry Work and Roof work

Heritage Mall

Burk Road, Spanish Town

Main Contractor

13-Dec

Structural Steel Work, Roof Work, Plumbing and setting out of sewage system, Road Way construction. Metal work including all staircase and balcony and rails. Structural work for main gate.

The Merion Apartment Complex

15 Charlton Road, Kingston 10

Main Sub-Contractor

2014

Setting out of Boundary Walls, Guard House and Retaining wall. Setting out of 7 blocks of Building. Structural Steel work, Masonry work and Carpentry work. Responsible for setting out of Road way, curve Walls. Metal work including all staircase and balcony and rails. Structural work for main gate.

Valhalla

5 Graham Heights

Main Sub-Contractor

2014

Renovation and upgrade of building. Which includes; putting up of Towers, metal work Steal Work

Vehicles and Supplies

19-21 Charlton Crescent, Kingston 10

Main Contractor

2015

All construction of Main Building and Rear Commercial Building. Setting of Road Way, Sewage System and Plumbing works and Electrical Works. Including the installation of concrete box Culvert. Responsible for the final design and modification of building. Supervise all Structural Engineers

Sugar and Spice Ltd

Barbican

Main Contractor

2016

Construct Reinforce Concrete Boundary wall 1 mile in perimeter

Cari-Med Ltd

Spanish Town

Main Sub-Contractor

2016-2017

Renovation and remodelling of office spaces (Accounts, Server Room), reconfigure bathroom facilities; renovate new born intensive care on behalf of Berts Auto. Current Maintenance personal for all location

Bert Auto

Camp Road

Main Contractor

2015-2017

Construction of Steel Frame Warehouse.  All Concrete and Civil Works and Demolition and Roofing works

Tarrant

Half Way Tree

Main Sub-Contractor

2016-2017

Construction and Installing of all metal staircases in the Town house Units. Responsible for Masonry band Installation. Fabrication of all picket fence and gate, including the construction of gym and pavilion

Valley Vista Townhouse and Villas Complex

Stony Hill

Main Sub-Contractor

2017-2020

Development of Steel frame warehouse, garage, canteen and main Administration Building. Including: infrastructure work, storm and surface water drainage and sewer system

BM Equipment/Zoukie Trucking

Chesterfield Road (Seaview)

Main Contractor

2018-2019

Sub/Super Structure, Roof, tiling, painting, installation of windows and door, drainage, sewer system and swimming pool

IQ Optical Residential Development

14 Easton Ave

Main Contractor

2019-2020

Sub/Super Structure, Roof, tiling, painting, installation of windows and door, drainage, sewer system

Island Concrete

Head Office (Caymanas)

Main Contractor

Feb 2020-Mar2020

Installation of steel frame structure

Commercial Development

8 Phoenix Ave

Sub-Contractor

2021

External works to include all civil works. Erection of Earth retaining Walls, Boundary Wall. Design and construction of roadways, including driveway, parking lot. Construction of carports, roof, entry foyers. All external Structural steel works. Erection of Entrance gate, Guardhouse and Trellis.

Medinah 21 Townhouse/Apartment Development

21 Salisbury Ave

Sub-Contractor

2021

Expansion of Warehouse (21,000 Sq. ft). Structural steel Frame with zinc roof panels. Sewage disposal and Stormwater disposal System

AMG Packaging

5 Retirement Crescent Kingston 5

Main Contractor

2021

Design and Construction of Negative edge Infinity pool

Private Dwelling

Beverly Hills

Main Contractor

2021-2022

Erection of Frame Structure for building to include Basement, Ground and First Floor. Design and construction of Sewage disposal system, Septic Tanks, Evaporation bed and Manholes. Waterproofing of Basement Walls. Retaining Wall Construction

Tile City Dwelling

3 Middleton, St Andrew

Main Contractor

2022

Design base and assemble for the installation of Concrete Silo.

Island Concrete

Caymanas

Main Contractor

2022

Design and Install Base for Scale used to weigh Aggregate and Concrete

Island Concrete

Clarendon Park

Main Contractor

 

Structural repair of collapsed floor

Juci Patty

Montego Bay, St. James

Main Contractor

2023

Warehouse Renovation

Bert Auto

Hagley Park Road

Main Contractor